German Solar PV Interconnection Procedure

April 15, 2007

by Paul Gipe and Nancy Nies

The following is a rough translation of the German interconnection procedure for small solar PV systems from a flyer produced by Novotech.

Note that under Germany's EEG no contract is required.

-End-

back to Archive of Articles

Copyright © 2003 by Paul Gipe. All rights reserved.
Wind-Works.org